Case study

Lifting Solutions: Advancing Reliability Through a Unified Approach

Advancing Reliability Through a Unified Approach – transforming a traditional vendor relationship into a strategic –partnership to drive innovation, efficiency, and safety.

February 28, 2025

article page header image

A major North Sea operator needed more than a vendor – they needed a partner. Faced with high crane maintenance costs, low efficiency, and limited reliability, they turned to EnerMech to challenge the status quo. We embedded technical experts from day one, streamlined maintenance strategies, and introduced innovations like predictive maintenance and campaign-based scheduling. The result? A 28% OPEX saving in year one, 98.5% equipment reliability, and a fully retained core crew. This case study shows how a unified, strategic approach to lifting operations can drive measurable improvements in safety, performance, and long-term value.

Key Highlights

  • “Challenge the Norm” philosophy

  • 28% OPEX savings in year one (3-year target met early)

  • 98.5% equipment reliability

  • 8,500+ hours of crane operations delivered

  • 150 work procedures developed

  • 100% core crew retention

View the full case study